Here is the second Corridor with the existing carpet.

Here is the second Corridor with the existing carpet.

Here is the second Corridor exposed

Here is the second Corridor exposed.

Here isthe second Corridor with the carpet removed.

Here is the second Corridor with the carpet removed.

Here is the secound Corridor first exposed.

Here is the second Corridor first exposed.

Here is the floor by the Stairwell plied and ready for the selected tiles to be laid.

Here is the floor by the Stairwell plied and ready for the selected tiles to be laid.

Here is the second Corridor with the Wenge border and plied ready for the selected tiles.

Here is the second Corridor with the Wenge border and plied ready for the selected tiles

Here is the second Corridor in the process of having the selected tiles fitted.
Here is the second Corridor in the process of having the selected tiles

Here is the second Corridor with the design floor complete.

Here is the second Corridor with the design floor complete.

Here is the second Corridor completed.

Here is the second Corridor completed.

Here is the second Corridor complete.

Here is the second Corridor complete.

Here is the second Corridor completed. The original carpet was uplifted along with the existing hardboard, the Wenge border was then put down creating the rectangular shapes, then ply was laid between the rectangles and finally the selected tile has been fixed in place and the Corridors sealed.

Here is the second Corridor completed. The original carpet was uplifted along with the existing hardboard, the Wenge border was then put down creating the rectangular shapes, then ply was laid between the rectangles and finally the selected tile has been fixed in place and the Corridors sealed.